M113 MRV Assembly (TABX01)

M113 MRV Assembly (TABX01)

How to assemble your M113 MRV fire support vehicles.

Check out the M113 MRV Platoon spotlight here...

M113 MRV Assembly (TABX01)
Assembling The M113 MRV
Step 1. Begin by attaching the left-hand side track to the hull. Step 2. Next, attach the right-hand side track to the hull. 
M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01)
Below: Both tracks secured to the hull. Step 3. Add the rear door to the ramp section.
M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01)
Step 4. Attach the ramp section to the rear of the hull. Step 5. Next, attach the glacis plate to the front of the hull. 
M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01)
Below: The glacis plate in place. Step 6. Attach the left-hand side fender to the side of the hull.
M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01)
Step 7. Attach the right-hand side fender to the side of the hull. Step 7. Next, attach the trim vane to the front of the glacis plate.
M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01)
Below: The trim vane in place. Step 8. Position the top deck in the hull assembly.
M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01)
Step 9. Attach the main gun to the turret. Step 10. Next, glue on the commander hatch in either the open or closed position.
M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01)
Below: The complete turret assembly. Step 11. Finish assembly by adding the turret to the hull.
M113 MRV Assembly (TABX01) M113 MRV Assembly (TABX01)
Below: A complete M113 MRV.
M113 MRV Assembly (TABX01)


Last Updated On Tuesday, June 19, 2018 by Charlie at Battlefront